Maintenance of TCDD Conventional Lines, High Speed Train Lines, A2, A3 Group Works for scope of 2 Years
Maintenance of all conventional high-speed train lines in Turkey for two years . As a result of two years of work, we aim to ensure the continuity of the 3,600 km temping, 4,400 km balast profiling, 3,600 km stabilization , 20 km balast cleaning, 100 km protective grinding, 100 km survey works and 50 km ultrasonic to be completed by this project and the continuity of comfortable transportation.
135 km from Karaman-Ulukışla 2nd Line Infrastructure and Superstructure Construction Work
Konya due to its location on the map of Turkey is a natural logistics centers and Karaman-Ulukışla Central Anatolia, with the completion of the Line will provide connectivity to the Mediterranean this project, TCDD Standards with 135 km high-speed railway line in length Karaman secure connection between Ulukışla stations Superstructure construction work of the high speed train line will be realized with the experience and experience of Demiryapı and Ekapark partnership.
Samsun – Kalın Project 400 km Protective Rail Grinding
Between Karaman-Ulukışla Stations 135 km. Infrastructure and Superstructure Implementation Construction Works
TCDD General Directorate Convertional Lines, Speed Train Lines and High-Speed Train Lines Track Renewal Works During 2 Years
TCDD 1. Region 1.150 Flash Butt Welding and 1.620 Aluminothermic Welding
TCDD 1. Region Installation of 40 Single Switches for 49 E1 Rail and Insulating Fishplate of Turnouts
TCDD 1. Region Installation of 49 Single Switches for 60 E1 Rail, 4 Crossover and Insulating Fishplate of Turnouts
TCDD 4. Region 1.400 Flash Butt Welding and 200 Aluminothermic Welding
TCDD 4. Region Supply and Installation Switches
TCDD 4. Region Between Hanlı - Bostankaya and Sarıdemir – Hanlı Stations 73 km Track Renewal Works, 1800 Flash Butt Welding and Protective Grinding
TCDD 5. Region Between Diyarbakır – Kurtalan Stations 2.400 Flash Butt Welding
TCDD 7. Region Between Alsancak-Eğirdir and Basmane-Afyon Stations Supply and Installation of 31 Switches
TCDD 7. Region Between Kadınhanı – Horozluhan Stations 2.500 Flash Butt Welding
TCDD 7. Region Between Karakuyu-Bozanönü Stations 3.000 Flash Butt Welding
TCDD 7. Region Between Afyon – Sandıklı Stations 2.850 Flash Butt Welding
TCDD 7. Region Between Azot-Seyitömer and Tavşanlı- Tunçbilek Stations 1.750 Flash Butt Welding
TCDD 7. Region 7.315 Flash Butt Welding with UIC 60 ve S49 rail Profiles.
TCDD 7. Region Between Afyon-Sandıklı, Azot- Seyitömer, Tavşanlı-Tunçbilek, Kadınhanı- Horozluhan and Karakuyu-Bozanönü-Isparta Stations Protective Grinding
TCDD General Directorate Production of 50 Track Vehicles
TCDD General Directorate Production of 10 Catenery Maintenance Machine